404 | Built His Own Building a Year Before the 2009 Crash | Matthew Fix

In 2008, a contractor friend pushed Matthew Fix to stop renting and build his own building. A year later the 2009 crash hit, and he says it was touch and go. He made it through, and he calls the building one of the best decisions he ever made.

Matthew started his fire sprinkler company in 1999 when his employer closed its fire division and sold him equipment and materials. He added a fire alarm company in 2004, runs an apprenticeship program for new tradesmen, and his business supports about 20 families beyond his own.

In this conversation with Chaz Wolfe, Matthew shows you how to build assets in your business, manage risk, and avoid the cheap vendor trap.

Matthew Fix:

https://www.flow-fire.com/

https://www.instagram.com/flowfireprotectioninc/

What Owners Should Take From This Episode

Matthew Fix started his fire sprinkler company in 1999 and added a fire alarm company in 2004. A year before the 2009 crash, he built his own building. Here is what construction, trades and home service owners can take from his story.

1. Own your building if you can

In 2008 a contractor friend pushed Matthew to stop renting and build his own building. It was a big step, and the timing was risky. He still calls it one of the best decisions he ever made. A building gives your business an asset beyond a customer list.

2. Expect risk and keep moving

Matthew moved into his new building about a year before the 2009 crash. He says it was touch and go, and he kept going through it. Every big move carries risk. Plan for the bad year before it comes.

3. Compare insurance apples to apples

Matthew once moved to a different insurance company to save money. Coverages his industry needed were missing, and things were not disclosed when he signed. He calls it a real mess. When a quote looks cheaper, check what was taken out.

4. Watch your current ratio

Matthew looks at his balance sheet often. He says the ratio of total current assets to total current liabilities is an important one to watch. When it looks off, dig into your expenses.

5. Reprice fast when costs move

Material costs rose on bids Matthew had already put out. As a subcontractor it is very hard to go back and renegotiate, and some contracts do not allow it. Keep your bid numbers matched to current costs so a price jump does not eat your margin.

FREE TOOL

Find out where your week actually goes.

The GTK Owner Time Audit shows you which hours belong to someone else.

Get The Free Audit

Ready to build a business that runs without you? Apply for Owner Freedom coaching.

Guest links: Flow Fire Protection and Instagram

 

Don't forget to subscribe to Gathering The Kings on YouTube!

Follow DRIVEN TO WIN on Apple Podcasts, Spotify, or your favorite podcast player to get weekly episodes in your feed.

Previous
Previous

403 | He Lost Everything at 27, Then Bet on Himself | Chris Castanza

Next
Next

405 | Scaling Too Fast Cost Him Hundreds of Thousands | Tyler Markham